Where a new clay-tiled wing meets a taller masonry cavity wall, a side elevation can show a neat diagonal of exterior flashing while leaving the wall’s internal drainage unexplained. The flashing handles the exposed junction. Water that has already entered the wall cavity needs a way back outside above the roof.
Look at the low end of the roof-to-wall line on a Kytun stepped blockwork detail. Each intermediate tray has a closed end. Water gathered in it leaves the open end and passes down the series to a catchment tray. A weep at that lowest tray discharges onto the roof. Ordering only the repeated intermediate fitting leaves the drawing without the outlet that completes this route.
A different system can show legitimate outlets in different places. Glidevale’s brickwork trays incorporate a weep at each step. Looking for just one opening at the bottom would be the wrong check for that assembly.
Read the masonry and roofing drawings together
On a copy of the elevation, mark the selected tray system and trace where the water exits. Add the finished tile profile at that point. A line representing the roof deck alone will leave out the battens, if specified, and the height of the tile surface that the water must reach. Have the mason and roofer confirm the outlet location while both have access. Keep a photograph of the tray arrangement before the wall closes and a second view showing the outlets alongside the finished tiles.