A clay tile lift-and-relay plan can identify exactly where the roofing crew will stop on Friday. The museum guard covering that evening may know the same location only as the west portrait gallery. Give both teams a common reference before the first tiles come up. Waiting for someone to translate a roof plan while water is visible beside a painting costs time.
Make a short entry for each active roof area. Pair the foreman’s slope or bay number with the room name on the guard’s door. Ask the collections manager which nearby rooms also warrant a check. The room where water appears gives the team a starting point for investigation. It cannot, on its own, identify the failed roof detail.
Try the call with the gallery closed
Use a hypothetical report to test the handoff: “West portrait gallery, water on the inside wall above the doorway, first seen at 7:10.” Can the duty officer reach the building’s emergency lead, and can that person reach both the roofing contact and the collections responder? Who can give authorized responders access after hours? Put working numbers on an internal duty card and update the card when the crew moves to a different slope.
The Canadian Conservation Institute explains that changes in a wet canvas painting may take time to appear and that paint layers can loosen. Its guidance calls for prompt contact with a conservator and an emergency plan naming people and responsibilities. Assign collections assessment and handling to the museum’s designated responders. The roofer needs the observed time and place, the limits of that day’s exposed area and the condition of the temporary protection. Both teams can use the same incident reference without guessing what happened to the artwork.
At handover, ask each team to record what it actually observed and which areas it could access. The tile lift-and-relay planning guide covers the exterior scope. Keep the gallery duty card with the institution’s emergency instructions, where evening staff can find it.
