A mason measures across a parapet above a clay-tiled addition. A supplier offers a coping wider than the brickwork. On paper it projects on both sides. But what matters to the wall below is where water leaves the underside. A groove nearly buried against a rendered face is a different detail from a clear groove beyond it.
Measure from the finished face to the groove
Ketley’s technical guidance describes clay brick copings that have both an overhang and a drip groove to shed water. Ask for an end view of the proposed coping showing the grooves, then draw the two finished wall faces below it. Include render or another finish wherever it continues up to the underside. At a stepped or uneven parapet, measure more than the convenient end nearest the scaffold.
For example, a coping centred above bare brickwork appears to project equally on each side. If a finish is added on the roof side only, the two projections will differ even though the coping has never moved. Place a straightedge against that finished plane when checking a sample. Record the clearance to the groove separately from the clearance to the outer nose. Use the selected supplier’s detail to judge the result.
Mark the tile-side flashing as a separate line on the same section. A coping sheds water at the top of the wall. It does not establish how the tile-to-wall junction below is weathered. Send the section back with the sample approval so the mason and tiler can each identify their part before either closes the joint. Identify any separate creasing tiles in the masonry schedule.