A clay tile terminal near the ridge might have served a soil stack for years. An extension introduces an opening dormer window on the same side of the house. The new work can change the relationship between the vent and the occupied room even if the roofer never touches the original terminal.
First establish which pipe the tile actually serves. A roof-space ventilator and a soil pipe can finish in similar-looking tiles. Trace the connection from the drawings or have the contractor identify it. For an open soil vent, England’s Approved Document H gives a useful drawing check. Where a building opening falls within three metres of the vent, its guidance places the outlet at least 900 mm above the opening. Marley also flags this relationship in its clay plain tile terminal detail.
Put both heights on one drawing
Suppose a proposed opening is two metres away horizontally and the outlet is 600 mm above the top of that opening. The drawing falls 300 mm short of the cited clearance. Changing the tile colour or ordering a wider collar leaves those dimensions untouched. Ask the drainage designer and architect to agree where the outlet or opening will go before the clay fittings are scheduled.
Label the terminal’s service, mark the opening on plan, and add the two elevations measured from a common level. Keep the revised drawing with the order for replacement tiles and fittings. This gives the plumber and roofer the same position to price. It also lets the owner identify the drainage outlet later when someone proposes an additional roof window.