A chimney is being reflashed while the concrete tiles around it stay in place. The price includes lead and labour. Before signing, ask the leadworker which surfaces will shed water onto the retained tiles and how the new lead will be protected as it weathers.
Sika describes a white carbonate deposit that can form on new lead and stain surfaces below it. The manufacturer particularly calls attention to areas where water flows across the metal and onto another material. Its patination oil is intended for the new leadwork. Adding a treatment to the tile order would put the product against the wrong surface.
Mark the runoff path on the scope
Consider a chimney apron that drains over a band of dark concrete field tiles. Photograph the tiles from a safe viewpoint before the flashing work. On a copy, outline the apron and the strip of roofing immediately below its lower edge. Ask the contractor to identify the exposed lead to be treated, who is responsible and how that work fits into the sequence. Retain the product name and completion date with the flashing record.
If white streaks appear later, an image that includes the upper end of each streak is more useful than a close-up of an isolated pale tile. A pattern beginning below the new metal gives the leadworker a specific path to investigate. The tile supplier may also want to consider deposits originating in the concrete. Share the before photograph and the treatment record with both trades before agreeing on any cleaning of the retained surface.
