At the end of a concrete tile job, the site manager sees a dark rectangle halfway up the front slope. Rain stopped an hour ago. The scaffold contractor is booked for tomorrow. The immediate decision is whether anyone needs another look while access is available. The cause of the rectangle can wait until the team has better evidence.
The UK Roof Tile Association recommends that the responsible site representative and roofer check the roof’s appearance before the scaffold comes down, preferably when the tiles are dry. Put that review on the programme early enough to allow a second viewing. If only half the slope has dried, note the conditions, mark the area on an elevation and agree when to look again. A photograph of a drying roof gives a poor basis for deciding that an entire band needs replacing.
Give the supplier a location it can investigate
Take a whole-slope photograph from an accessible viewpoint, then a closer photograph that someone can locate on the first. Mark the limits of the band by a dormer, course or other fixed feature. Use the same viewpoint at the dry review. Retrieve the product name, profile, color, supplier, delivery dates and pallet batch labels. Ask the crew which loads served the marked area. If pallets were opened together and the sequence is unknown, record that explicitly.
For example, a band that is still visible when dry and aligns with a change in delivery gives the supplier a specific comparison to make. That alignment alone cannot establish a manufacturing fault. A band that disappears as the slope dries calls for a different entry: keep the paired photographs and record the conditions under which the difference was visible.
Close the access decision in writing
Tell the site manager who reviewed the dry roof, what remains unresolved, who is contacting the supplier and whether the supplier needs access. The person controlling the scaffold can then make an informed release decision. Keep appearance observations separate from checks on fixings and weathering. If the concern is a white surface deposit, the Guild’s guide to documenting deposits addresses that investigation.