A roofer’s drawing calls for a deep-trough valley where two concrete tile slopes meet. The metal supplier quotes a strip of coil by width and length. Before comparing that price with a quote for fabricated flashing, ask to see the end view of the metal each supplier will deliver.
Read the bends on the end view
In the Tile Roofing Industry Alliance’s MC-17B detail, the flashing extends at least 11 inches each way from the valley centerline. A splash-diverting rib at the flow line rises at least one inch and is formed in the flashing. Bending a rib and forming the trough uses metal. A flat blank exactly 22 inches wide gives the fabricator no extra stock to form those bends while retaining the specified reach on each side.
Give both bidders the roof plan, the drawing number and the valley length. Ask the sheet-metal shop to dimension its finished section and calculate its own blank width. Check which party supplies the formed pieces and whether the quoted lengths allow for the joints. The manual flags wider metal for large collecting areas or long rafters. Have the designer resolve that question before ordering either width.
Keep the accepted cross-section with the roofing order. The adjacent cut tile fixing detail tells the roofer how to retain the pieces bordering the trough. The sheet-metal section gives the fabricator what is needed to price the waterway between them.