A pest-control estimate includes a bead of sealant along the full length of the metal strip below the first course of concrete tiles. A neat continuous bead would be easy to inspect. It could also close the place where water is meant to leave the roof.
Look at the different eave sections in the Tile Roofing Industry Alliance manual, detail MC-10. The metal closure in one section sits above drip flashing and has an opening for drainage. Another section depicts a riser with a bird stop and an optional vent. A row of openings in a site photograph therefore needs a closer description than “gaps at eaves.” The lower edge, the tile profile above it and the metal behind it help the roofer decide which drawing is relevant.
Mark the intended work on one representative bay
Ask the roofer to identify the closure, the drainage exit and any intended ventilation openings on a close photograph before the pest contractor starts. Mark a torn section or an end where an entire piece is missing separately. If wind damage has distorted the strip, identify the replacement component and show how the discharge over the flashing will remain open. Specify the affected bays rather than authorising continuous filling along a sound eave.
For closeout, ask for the same view after repair. A photograph of the finished tiles from across the street may show a straight eave but will rarely show the drainage opening. Keep the close view with the under-tile drainage inspection record so a later maintenance contractor can see why the opening was retained.
