Two roofers quote the same concrete tile reroof. One carries a stucco repair allowance along the sidewall, and the other expects to leave the wall finish intact. The price difference can hinge on a piece of metal that is partly hidden. Ask each bidder to sketch the junction and identify what must move to replace the roof flashing.
The Stucco Manufacturers Association illustrates a continuous Z-bar detail for framed stucco walls. The part integrated with the wall stays in place while the roof-side flashing can be renewed. The association also shows why other terminations may require opening a strip of stucco during reroofing. In each case, the junction needs a route for incidental water behind the finish to escape.
Put the access assumption in the estimate
Ask for a section that shows the existing stucco termination and the crest of the proposed tile beside it. A higher replacement profile may occupy space a roofer expected to use to release the metal. A photograph of a horizontal line across the plaster alone cannot establish which components are separable or how the concealed layers overlap.
If the detail remains unknown, agree on a limited inspection location and who will authorize reinstatement. Record the length of wall affected, who prices lath and finish repairs, and how a texture or color match will be approved. Use the association’s sketch to frame those questions, then have the trades coordinate a detail for this particular tile and wall. Keep that decision with the roof handover records so the next estimator can see what was actually installed.