Preserving the craft. Building its future.

Concrete tile · Pre-cover inspection

Do the batten joints line up over the same roof truss?

Check the pattern of batten ends across several rows before interlocking concrete tiles hide the joints.

By the Slate, Tile & Metal Guild ·

Suppose a crew laying out an interlocking concrete tile roof starts every row of battens with the same length of timber. The first joints may all sit neatly over the center of a truss. A close-up of any one joint could look satisfactory while a wider photograph shows a row of timber ends running straight up the roof.

Marley’s UK installation guidance checks two things. The ends of an individual batten meet over a support. The number of joints sharing that support is also limited. Where the vertical spacing between batten rows exceeds 200 mm, its guidance allows a joint in only one of four consecutive rows over the same truss.

Read the marks up the slope

On a framing sketch, label four neighboring rows one through four and mark the truss at every batten joint. If row one and row four both have a joint on truss C, those two joints occupy the same four-row window even though there are two unbroken rows between them. Move the window up one row at a time when reviewing the rest of the layout. Looking only at separate blocks of four can miss a cluster across the boundary.

For the pre-cover record, ask the installer for a view wide enough to show both the truss lines and several rows of joints. Have the crew resolve any conflict with its specified layout while the timber is exposed. The guide to battens and counterbattens helps identify which members run across the slope in that photograph.

Further reading

Marley · How to install roofing battens in four simple steps. Marley describes UK batten construction. Verify the project specification, batten gauge and supporting structure before applying its guidance.

Published by the Guild as part of Tim Kelly’s Slate Boss resource network. These educational guides support project conversations and do not replace an on-site inspection or a project specification.

← All roofing articles