The top courses of a slate roof can be ready for a ridge cap while their faces are still dusty from cutting. Where a ridge roll has adhesive edges, the distinction matters. A photograph taken after the caps go on can show a straight ridge line and still tell the owner nothing about the surfaces to which the edges were pressed.
Hambleside Danelaw’s CON6+ instructions call for slate receiving the adhesive to be dry and clear of cutting dust, grease and other contamination. The centre of the roll serves a ventilation function. The manufacturer cautions against stretching that centre, crushing the corrugated edges under the ridge tile or leaving the adhesive strips and centre membrane exposed to direct sun.
Agree on the inspection while the first length is visible
For this system, have the installer identify the two strips of slate the roll will contact. If one roof face dried before the other after a shower, record the condition on both sides. If fresh cutting nearby deposits dust after an earlier check, inspect the surface again before bonding. Ask the installer to follow the manufacturer’s preparation instructions for the actual surface.
At a trial length, have the installer show where the ridge tile bears and what it covers. Keep one photograph of the receiving slates and a second of the trial fit, labelled with the ridge run and kit. Mechanical fixings for the caps have their own detail. A photograph of the finished screw heads cannot document the concealed adhesive edges. For a larger run, agree on these views when planning the first slate test panel.
