A new extension is to meet an existing pantiled roof. The drawing shows a full tile over the gutter and another full tile at the ridge. The roofer lays out a row of the specified tiles and finds that both ends cannot finish as drawn. Can the difference just be divided among the courses?
Marley’s Eden is a single-lap clay pantile laid to a fixed gauge. Treating each batten interval like an adjustable space would change how adjacent courses engage. Marley’s sitework guide describes two places where a fit can instead be made on this particular tile. One involves shortening the head of the top course and providing a new fixing hole. The other involves trimming the shoulder of the eaves tiles so the course can close up. They produce different work at opposite ends of the roof.
Price the edge that will actually change
Ask the roofer to mark the first and last batten positions on a section of the measured slope and show a trial run at the stated gauge. If the eave must line through with the adjoining roof, have the designer review a top-course solution first. If an exposed ridge detail needs the full tile geometry, ask for a drawing of the eaves option showing the resulting tails over the gutter. In either case the fixing detail needs to follow the tile maker’s instructions.
A narrow sample of two or three columns can settle the choice before battens are set across the entire width. Record the accepted end detail with the eaves sample measurements. That leaves the estimator with one identified course to allow for and gives the crew an agreed reference at the junction.