Across a narrow courtyard, an upstairs reading room looks straight at a proposed tile roof. The owner asks whether someone sitting by the window will see a bright reflection. The tile supplier has provided a color card with an aged Solar Reflectance Index. What else does the architect need?
Take an actual product sheet. Ludowici lists Royal Persian as blue, calls the sheen gloss and gives an aged SRI of 15. The Cool Roof Rating Council explains how SRI is calculated from solar reflectance and thermal emittance. Window position, roof orientation and time of day are absent from that index. A value of 15 tells the reader neither when a reflection might appear nor how bright it would look from a chair.
Put the observer on the drawing
On a section through the courtyard, mark the seated eye position, the window and the part of the roof visible through it. On the plan, mark north and the direction that roof face slopes. Ask which hours matter to the occupant. A west-facing reading room used after school poses a more specific design question than “will the tile shine?” Keep the assessment tied to the visible slope, including a curved hip fitting if it sits in that view.
Specify what the sample is meant to show
Ask the maker for the proposed glaze on the actual field profile. Arrange several pieces in a safely accessible mockup with the same pitch and compass orientation. Select a viewing position that reproduces the angle from the window as closely as the site permits. If comparing a lower-sheen alternative, set both panels at the same angle and observe them together. Record the time, sky conditions, position and which part of each tile showed a highlight. An overcast viewing can settle a color preference while leaving direct-sun behavior unresolved.
File the observations with the sample identifiers. If the window is sensitive or a planning condition sets a glare criterion, give the marked drawings and product information to the person assessing that criterion. One afternoon’s viewing cannot cover a full year of sun positions. Keep any separate energy requirement with the roof reflectance schedule.