Which sizes in a graduated slate order need a different hole pattern?

Sort the schedule by both length and thickness before asking a quarry to punch a heavy graduated slate order.

By the Slate, Tile & Metal Guild ·

A graduated roof order lists long, thick slates for the lower courses and shorter, thinner pieces higher up. The buyer adds “punched” at the bottom of the order. That word settles who prepares the holes, but the quarry still needs to know whether the same hole pattern applies to every size.

The National Slate Association’s nail-hole bulletin describes a customary four-nail arrangement for slates at least three-quarters of an inch thick and at least twenty inches long. Both measurements matter. A twenty-two-inch piece listed at half an inch thick and an eighteen-inch piece listed at three-quarters each meet just one of those conditions. A twenty-two-inch piece listed at three-quarters meets both. The bulletin gives the designer and supplier a reason to review that last line separately. The actual attachment schedule governs all three.

Match the quarry ticket to the courses

Give each group its course range, length, thickness range and quantity. Where the thickness range straddles the design cutoff, ask how the supplier will sort and identify the pieces before punching. Request a dimensioned hole layout for each approved pattern. With mixed stock, a single punched display sample can conceal the fact that another group needs different preparation.

Carry the approved group identifiers onto crate labels and the receiving sheet. Ask the site team to compare a delivered piece from each group with its layout before sending that crate to its roof area. Keep the colour mix by size on the same schedule so the intended blend and the required hole pattern travel together.

Further reading

National Slate Association · Technical Bulletin No. 1, Nail Holes. The bulletin describes customary North American practice. Project-specific fastening and quarry preparation require confirmation.

Published by the Guild as part of Tim Kelly’s Slate Boss resource network. These educational guides support project conversations and do not replace an on-site inspection or a project specification.