On a drawing of a single course of concrete plain tiles, a narrow gap at the gable looks easy to solve: trim the piece nearest the edge. Draw the course above and the decision becomes less obvious. The cut changes the position of a joint, and that joint has to be covered by the next course. It also matters which tile was ordered to make the exposed edge.
Marley’s plain-tile setting-out guidance keeps the verge tile and the wider tile-and-a-half whole where adjustment by cutting is needed. The adjustment goes into the neighbouring tile or tiles. In that detail Marley calls for at least 55 mm of side lap. This is the offset that covers the joint below. It is a different dimension from the overhang beyond the gable. Measuring a neat overhang does not establish the side lap.
Ask for two courses on the drawing
At the gable, identify the outside edge, the first joint in each course and the edges of the tiles covering those joints. Mark the intended cut with a pencil line on the layout and write the resulting side lap beside it. If the proposal solves the gap in one course but leaves too little cover in the next, have the installer revise the set-out before cutting the batch. Where the gable wanders, check the layout at more than one height.
For ordering, keep the full verge pieces, wider pieces and field tiles in separate columns. Otherwise an estimate can have the correct total number of tiles and still run short of intact edge pieces. If a proprietary verge system is proposed, identify it on the sketch before using this detail. The Guild’s retrofit verge guide covers the separate question of fitting an accessory to existing courses.