A slater is relaying an opened section of roof on its existing battens. Two replacement samples have the same length, width and visible tail. The supplier offers each with holes already made. On an old roof with strips of wood separated by open space, the two samples can fit the same outline and still put their nails in different places.
Preservation Brief 29 describes one historic arrangement in which each slate was nailed to a batten across its middle and rested near its head on the batten above. The distance between successive battens followed the exposure of the slate. That description gives the surveyor two places to look during an authorized opening: the wood at the fixing line and the wood beneath the upper end.
Start both measurements at the exposed tail
Have the slater mark the intended tail line on a section through the repair area. Measure upslope from there to the near and far edges of the fixing batten and to the head support. Set each new stone alongside that sketch with its tail in the same position. Mark the center of each proposed hole. A point over the gap rules that sample out as supplied. A point over wood still needs the slater’s assessment of edge distance, wood condition, lap and fastening.
Moving the slate downhill until a hole finds wood changes where its tail falls compared with the surrounding course. Instead, return the marked section to the supplier and ask which holing pattern it can provide. Retain a labelled sample for the actual repair area. A field exposure calculation checks the visible courses but cannot locate the wood hidden under them.
