A roof plan often shows an access window as an empty rectangle. That is how the opening looks before the sash goes in. Once open, a side-hung sash can stand between the person at the sill and the first step of the planned maintenance route. Where that happens, increasing the width of the window may leave the same obstruction.

Draw one view from each side of the opening

On the attic drawing, mark the side where the hinges sit as seen by a person facing out. On the roof drawing, use a fixed landmark such as the chimney to identify that same jamb. Draw the sash open and locate the first intended landing or platform. The person looking down from above and the person looking out from below can both say “left” while pointing to opposite jambs.

FAKRO describes its wooden FWP as a model whose opening direction can be changed during installation. That distinction matters when ordering: a change permitted while fitting one model says little about reversing a different window after the flashing and surrounding slate are complete. Ask the supplier to mark the actual hinge side and opening envelope on the project drawing.

Have the access designer review the approach, landing and protection with the window in the open position. Record the agreed arrangement before the slater fits the surrounding courses. The ability to step through a sash alone does not establish a safe route across slate or approval for use as an emergency exit. Keep the marked view alongside the window flashing schedule.

Further reading

FAKRO — Product catalogue, Access roof lights, FWP. The changeable opening direction described here applies to the FWP in the cited catalogue. Verify the exact product and market before ordering.

Published by the Guild as part of Tim Kelly’s Slate Boss resource network. These educational guides support project conversations and do not replace an on-site inspection or a project specification.

← All roofing articles