How much room will the new dormer window leave above the slate?

Compare the proposed sill and finished roof levels before ordering a dormer window that could leave too little room for its flashing.

By the Slate, Tile & Metal Guild ·

A replacement window can fit the width of a dormer and still crowd the roof immediately below it. Before releasing the order, ask for a section through the middle of the sill. Put the existing sill, the proposed sill and the top of the finished slate on that section. A dimension taken from bare decking during demolition can make the available space look more generous than it will be.

Read the sill detail before choosing the unit

The National Slate Association calls for at least four inches below the sill in its new-construction detail. It also calls for end dams and soldered joints at the rough opening. The vertical measurement alone cannot show how water at the ends of the sill gets out. Ask the window supplier and sheet-metal contractor to mark those ends on the same drawing.

For an existing dormer, have the reviewer identify whether flashing can pass beneath the retained sill. The guide discusses metal cladding where that route is unavailable and stresses the need to keep water out of the wood beneath it. If an estimate assumes the old sill can simply be covered, ask who will inspect its condition and detail the ends before the window dimensions become final.

The window order should reference the agreed section and the drawing revision. Keep the folded apron corner detail with it so the roofer can see how the sill work meets the flashing farther down the dormer.

Further reading

National Slate Association · Mobile Field Guide, Dormer Window Sill. The four-inch dimension in the guide concerns new construction. Its rehabilitation detail addresses a different condition.

Published by the Guild as part of Tim Kelly’s Slate Boss resource network. These educational guides support project conversations and do not replace an on-site inspection or a project specification.

← All roofing articles