In a section drawing through a slate ridge, trace one of the last field slates from its exposed lower edge to the place where its head is fastened. What holds the underside there? A drawing can show substantial timber under the pair of ridge slates while leaving the support for the short field slate below them unclear.
The National Slate Association describes a separate wood field nailer when the finishing slate is considerably shorter than the full course below it. That nailer supports the head. Without support at that point, drawing the head down can tip the visible lower edge upward. The carpenter measuring the ridge timber and the slater setting the last courses need to discuss two locations on the section.
Review a section through the actual last course
Have the slater mark the last full slate, the finishing slate and its intended fastening point at their proposed sizes. Have the carpenter mark the supporting faces on that same section. If the course layout changes on one side of the ridge, check that side separately. The guide describes the condition that calls for support without assigning a universal cutoff length.
Keep the section with the layout of the last pair along the ridge. The section settles what holds the final field course in plane. The layout settles where the paired ridge slates end along the roof.