A building name can take you to the right monument and the wrong roof-work decision. At Argyll’s Lodging in Stirling, two Historic Environment Scotland records identify the same scheduled monument, SM90286. If a works schedule simply says “roof consent granted,” the person ordering a replacement ridge stone has too little information to act.
Case 300069541 covered re-slating, work to the timber sarking and defective leadwork, and cutting grooves for the lead where needed. The decision of 16 January 2024 granted consent without conditions. The portal lists a drawing numbered 325-286-396 revision F among the documents. A second decision at the same house, case 300088645, concerned replacement of a damaged ridge stone. That application received consent with conditions on 28 September 2026. Both records include a decision notice.
Give the order a traceable starting point
For a similar project, enter the roof location, proposed operation, case number and applicable drawing revision together on the work schedule. Attach the notice. Where a condition affects the proposed order, record its exact wording, the person responsible and what evidence that person needs before releasing the order. File a later instruction beside the line it changes. Someone pricing field slates can then see immediately whether a separate ridge item has been released.
If a new item turns up during opening, describe it and send its location to the person administering consent. A photograph of a damaged stone may explain the change very well while saying nothing about permission to replace it. The Guild’s guide to recognising a skewputt at the eaves illustrates why naming the individual stone matters when writing that description.
