Look up at the outside corner of a hipped slate roof and a short metal end can be visible beside the lowest cap tile. From ground level it is easy to group that metal with old gutter fittings. Before a fascia or gutter contractor cuts it away, ask the roofer to identify what the metal connects to and whether it belongs to the hip.
SSQ’s UK natural slate guide illustrates a ridge-tiled hip with a hip iron fixed to the hip rafter. The first cap tile is cut to meet the corner at the eaves. The guide also calls for mechanical fixing of the hip tiles. Finding an iron at the bottom does not establish how the rest of the cap run is secured.
Mark the end of the hip on the repair drawing
Ask for one photograph looking up the line of caps and a second showing the relationship between the lowest cap, the projecting metal and the gutter corner. Label anything still concealed. If the scope includes opening the corner, have the roofer record the attachment before the eave is closed. Show who will handle that fitting and who will reinstate the cap end. A gutter quote measured in linear feet can otherwise omit the one place where the two trades meet.
Where both intersecting planes finish in cut slate without a cap, the corner has a different construction. Compare the hip sections on the bid drawing before assigning this repair to every corner of the building.
