On a glazed roof set into a slate slope, the sill can be the first place a visitor sees a drip and the last place the water travelled. A bead of sealant across an apparent gap at the sill might close the outlet that the glazing frame needs. Before the roofer prices a new apron, ask for a section through the lower end of the glass.
Follow the water through one glazed bay
The Smithsonian’s design standards illustrate the question a reviewer should ask. They call for channels in the glazing cross members to empty into channels in the sloping rafters. Those gutters collect both leakage and condensation. The sill flashing has a separate job where the skylight meets the building exterior. On an existing roof, the glazing shop drawing or a glazier’s examination can establish whether that assembly works the same way.
Ask the glazier to mark one crossbar, its junction with the rafter and the intended discharge point. Then have the slater draw the head of the course immediately beneath that point and the apron that returns water onto the roof. Put the drawings together at the same scale. If an outlet ends behind a proposed upstand, resolve that conflict before fabricating the flashing.
For a leak investigation, log what was wet at the crossbar, the sill and the underside of the roof deck, including when it was observed. Water in a collection channel shows the channel received water. It does not by itself identify its source or prove the adjoining slates leaked. Include the marked section in the roof inspection report so the owner can see which trade has evidence for a repair.
