Does slate tear-off used as landfill cover count toward LEED diversion?

Follow the outgoing material from the sorting facility before reporting how much of a mixed roofing load was diverted.

By the Slate, Tile & Metal Guild ·

A scale ticket shows that a truck delivered debris from a slate reroof to a sorting facility. It does not show where the sorted material went. That distinction matters if the facility’s report includes alternative daily cover, the material placed over exposed waste at a landfill at the end of an operating day.

Check what the facility counted

The U.S. Green Building Council’s guidance for commingled construction and demolition debris excludes alternative daily cover from eligible diversion in LEED v4, v4.1 and v5. Ask whether the rate printed on the facility’s summary includes that destination. Keep the period, facility and calculation method with the number. A photograph of a container full of dark broken stone cannot establish its composition by weight.

Consider a simplified facility report for 100 tons of incoming debris. It records 70 tons recycled into products, 10 used as daily cover and 20 landfilled. If the headline groups recycling and cover together, it reads 80 percent. Under the stated assumptions, the eligible recycling share is 70 percent. This example illustrates how to read the facility report. It gives no measured recovery rate for the slate from a particular roof.

Close the gap in the project file

Retain the haul ticket and its net weight. Ask the project’s LEED reviewer which facility records apply to that delivery and how to enter the mixed load. Slates set aside intact for reuse on site should have their own record. Check that those pieces have not also been counted as material hauled away.

Further reading

U.S. Green Building Council — LEED Commingled C&D Recycling Rate Reporting Guidance, table 3 and glossary. This discussion concerns the LEED versions in table 3 and uses an invented arithmetic example.