A bid can include a dumpster, hauling and disposal fees without saying how broken slate gets from the work area into the dumpster. On a building that stays open during repairs, a container shown on a parking plan tells the owner little about whether visitors will still be able to reach the door.
Ask for a section as well as a plan. On the section, identify the point from which material would be dropped and the receiving point outside the wall. Under federal OSHA construction rule 1926.252(a), an exterior drop of more than 20 feet requires an enclosed chute made of wood or equivalent material. An open slide lacks the enclosure the rule describes. A shorter drop still needs a safe handling plan.
Follow one rejected slate through the drawing
Suppose the only available container space is across an entrance from the staging area. Trace where a rejected piece would travel. Have the contractor show where the chute would discharge, where the container would stand during removal, and how the public entrance would operate during that phase. If the contractor proposes lowering debris by another means, ask to see that route and its effect on access. Settle those details before comparing allowances.
Give the crew a separate destination for whole slates that the owner wants assessed for reuse. Once they enter the debris stream it can be impossible to identify which pieces came from which slope. The guide to reading a tear-off scale ticket explains what the disposal record can establish after collection.