A cut slate fits the valley line beautifully. Its face covers the edge of the copper. The inspector can see the cut and the width of the open channel, but the roof will hide one more important dimension: how far the sheet continues underneath the stone.
During the sample layout, have the slater place the cut stone on a drawing or off-roof mock-up at its intended position. Trace its outline, mark the existing nail holes, then lift the stone and add the concealed edge of the flashing. A hole inside that metal outline would put the slate nail through the sheet. Changing the angle of the visible cut may do nothing to move the hole.
Show a complete fixing detail
The National Slate Association describes relocating holes, changing their arrangement on the slate, or using wire secured farther upslope where appropriate. If an existing hole conflicts, ask the slater to show the selected fixing, the sound stone remaining around it and its attachment to the deck. Simply omitting a nail leaves the question of restraint unanswered.
Review a course where the valley cut leaves a narrow piece as well as one with a broad piece. Keep the approved sketch with the valley taper drawing. The finished channel photograph records the appearance. The uncovered mock-up records where the fasteners can go.
