A small pipe above a slate wing runs during a storm, even though the main downspout beside it seems to work. Before drawing a connection between the two to tidy the elevation, find out whether the small pipe is the emergency outlet for a different roof. Seeing it run may be how the building staff first learn that water is backing up above the parapet.
Trace the route from both ends
Mark the upper roof area served by each inlet on a plan. On an elevation, identify where each route ends and where a person on the ground could see a discharge. A leader drawing that stops at the cornice leaves the facilities team guessing which pipe to inspect. Two drains at the same roof elevation can serve different catchments.
New York City’s 2022 Plumbing Code illustrates why the outlet deserves a drawing note. Section 1108.2 generally requires a separate endpoint for the secondary system, above grade where people can see it. The city allows connection to a primary vertical conductor where separate systems are impractical or where this prevents discharge over a pedestrian route. Ask the designer which local requirements apply and whether a documented exception explains the arrangement on this building.
In the handover notes, pair a photograph of the outlet with the roof area it serves and the person to call if it runs. Record the time of the observation and whether the primary outlet was flowing. Ask the maintenance team to investigate the upper roof before attributing a wet patch below to a failed slate. The upper-roof runoff guide explains why concentrated discharge also matters to the lower slope.