Follow the side joints up a roof laid in diminishing stone slates and you may find an extra stone in the next course. The roof can be the same width at both levels. As the slates get smaller farther up the slope, the slater needs more pieces to span that width. A narrow stone that looks like a later patch may belong to the original layout.
The Stone Roofing Association calls the narrow stone a backer when it sits over the middle of a broad stone below and adds a piece to the course. Check the course above as well. If a broad stone covers the narrow one again, the gain in piece count does not carry up the slope. That relationship is easiest to read while both courses are still on the roof. Once the pieces have been lifted and sorted into piles by length, their original sideways positions are easy to lose.
Keep the wide stone in the photograph
For an area due to be stripped, mark a fixed left and right boundary on an elevation photograph. Trace the joints in the course below the suspected backer, its own course and the course above. Count the pieces between the same two boundaries each time. Record which lower stone spans the transition, then give it and the narrow piece separate tags tied to the same sketch.
At the sorting bench, the sketch answers a question a stack count cannot: which broad stone and narrow backer should be set aside together for this stretch of roof? Let the conservation slater check the arrangement and laps against the surrounding work before specifying replacements. The guide to identifying the weather face explains another detail worth marking before the stones leave their courses.
