The window installer can fit the dormer frame today because the wall above the opening is still bare. Once the clay tiles are hung, will a future installer be able to remove the frame without stripping the wall?
The UK Roof Tile Association’s second window-head detail accounts for both installation and removal after tiling. A shaped timber fillet supports the bottom course above the lintel so the tiles hang in line with the wall covering. Their finished lower edge sets the clearance at the head. A window that opens freely only demonstrates sash clearance. The surrounding frame may need more room to come out.
Draw the frame on its way out
Before the tiler fixes the first course, give the window supplier a section with the actual frame profile, trim, support fillet and tile tails. Have the supplier mark the intended removal direction and any trim that must come off first. The tiler can then check the finished edge against that path with a tile held in its proposed position. An elevation drawing alone can hide the obstruction because it flattens the projecting tile edge against the frame.
If the two clash, return the detail to the designer while the batten positions can still be revised. The association’s drawing ties the window-head course into the gauge of the surrounding wall tiling. Moving a single row above the glass may also change the lines running into the tiles around the dormer corners. Keep the agreed section with the window model and replacement instructions so the next crew knows where the clearance was provided.
