Shifting a dryer cap away from a valley can give a tile roofer more room to flash it. On the roof plan the shift looks small. Inside the attic it may require going around a framing member, adding a bend as well as length. Before marking the new tile opening, the mechanical contractor needs to check both changes against the appliance instructions and applicable local requirements.
Read across the correct row
GE’s installation manual 49-90105, page 13 gives an example for the dryers it covers. In the rigid-metal duct table, the preferred hood column allows 44 feet with two 90-degree turns and 32 feet with three. The manual also specifies the performance a roof terminal must provide. A roof cap with the same nominal duct diameter still needs that check.
Suppose an existing run measures 36 feet with two turns and the proposed alignment measures 38 feet with three. Under that particular table and hood assumption, the original run falls within the stated length. The revision exceeds it by six feet. Comparing only the extra two feet would miss the change of row. These figures illustrate how to read the table. Use the instructions for the dryer actually connected to the system to evaluate a real relocation.
Release one coordinated location
Give the mechanical contractor a section showing both routes, the terminal model, duct material, bends and measured runs. Have the tile contractor mark where the approved outlet’s flashing fits the profile. If the route needs redesign, settle it before cutting replacement tiles. Keep the agreed route with the dryer model record so a future appliance installer can evaluate that same run. The Guild’s dryer cap guide covers the separate question of the terminal’s discharge opening.