A slate replacement bid promises a magnetic sweep of the driveway each evening. Before accepting that as the whole cleanup allowance, ask what kind of nails the roofer expects to remove and use. The National Park Service’s slate preservation brief describes both copper and steel nails in existing work. One repair area can contain more than one generation of fasteners.
A wheeled sweeper picks up magnetic debris such as ordinary steel nails. A solid copper slating nail stays on the ground when the magnet passes over it. Slate chips do too. A pile of steel fasteners on the sweeper tells you it worked on that material. It tells you little about what remains in the gravel beside the drive.
Write the handback around the areas people use
Walk the delivery route and the ground below the work with the contractor before stripping starts. Mark the paved path that must reopen each night, the gravel border beside it and the place where debris will transfer into the container. Ask how the crew will contain loose pieces at each location, collect nonmagnetic debris and check the borders after removing the protection. A broom and collection pan may serve the paving while the gravel needs a different collection plan.
At handback, identify who inspected each area and which areas still need to stay closed. Include the route in the tear-off debris plan so the cleanup allowance follows the debris all the way to the container.